"April 14th 1944

Confirmed: Chief of the GBTU USA, Major General of the Tank Engineering Service, Alymov

Plan of the 3rd Department of the GBTU USA for April-May 1944

Work

Executor

Due date

Controlling the completion of 100 mm D-10S gun installation into the SU-100 at factory #9 and the Uralmash factory.

Konev

May 1st, 1944

Organizing and performing large scale trials of the SU-100 from the first batch.

Konev

June 1st, 1944

Taking part in SU-152M trials with an OBM-143 gun and giving conclusions.

Ryabtsev

May 1st, 1944

Controlling the installation of and participation in trials of the 122 mm high power gun into the ISU. Giving conclusions.

Ryabtsev

May 15th, 1944

Controlling the production and testing of the 85 mm high power gun.

Konev

June 1st, 1944

Organizing and execution of trials of the SU-85 (GAZ). Giving conclusions.

Volgushev

May 15th, 1944

Controlling experimental work at factory #38:



·         Testing the installation of the 122 mm howitzer into the SU-76M

Afanasenkov

May 15th, 1944

·         Correction of defects of the SU-37 discovered during proving grounds trials.

Vasilevskiy

May 1st, 1944

·         Organization and execution of SU-37 trials after the prototype is improved. Giving conclusions.

Vasilevskiy, Volgushev

May 20th, 1944

Organization and execution of proving grounds trials of the SU-37 produced by factory #40. Giving conclusions.

Vasilevskiy, Volgushev

May 15th, 1944



Via Yuri Pasholok.