"April 14th 1944
Confirmed: Chief of the GBTU USA, Major General of the Tank Engineering Service, Alymov
Plan of the 3rd Department of the GBTU USA for April-May 1944
Via Yuri Pasholok.
Confirmed: Chief of the GBTU USA, Major General of the Tank Engineering Service, Alymov
Plan of the 3rd Department of the GBTU USA for April-May 1944
Work | Executor | Due date |
Controlling the completion of 100 mm D-10S gun installation into the SU-100 at factory #9 and the Uralmash factory. | Konev | May 1st, 1944 |
Organizing and performing large scale trials of the SU-100 from the first batch. | Konev | June 1st, 1944 |
Taking part in SU-152M trials with an OBM-143 gun and giving conclusions. | Ryabtsev | May 1st, 1944 |
Controlling the installation of and participation in trials of the 122 mm high power gun into the ISU. Giving conclusions. | Ryabtsev | May 15th, 1944 |
Controlling the production and testing of the 85 mm high power gun. | Konev | June 1st, 1944 |
Organizing and execution of trials of the SU-85 (GAZ). Giving conclusions. | Volgushev | May 15th, 1944 |
Controlling experimental work at factory #38: | ||
· Testing the installation of the 122 mm howitzer into the SU-76M | Afanasenkov | May 15th, 1944 |
· Correction of defects of the SU-37 discovered during proving grounds trials. | Vasilevskiy | May 1st, 1944 |
· Organization and execution of SU-37 trials after the prototype is improved. Giving conclusions. | Vasilevskiy, Volgushev | May 20th, 1944 |
Organization and execution of proving grounds trials of the SU-37 produced by factory #40. Giving conclusions. | Vasilevskiy, Volgushev | May 15th, 1944 |
Via Yuri Pasholok.