The AK is subject to a number of ongoing raging discussions, one of which had to do with its name. Some claim that there was no such thing as an AK-47, with the name of the gun being simply AK, later replaced with the AKM. Sound logic, but it is not confirmed by documents, which use the name AK-47 extensively. For instance, the manual.


Internal documentation uses the indexes AK and AK-47 to refer to the same item interchangeably. From a list of experimental works of the NKV for 1951:

"Increasing production rate and quality of mechanical finish on parts and assembly of new types of weapons. Development of new high production rate processes of finishing parts and assembly of the AK-47 system.
  1. Development and agreement on blueprints.
  2. Development of high production rate technical processes for mechanical finishing and control of AK-47 parts (factory #74 and NITI-40).
  3. Development and distribution in the Q1 of 1950 of technical tasks for design of new equipment and modernization of old equipment. GSPI-7 is to receive a task for design of transport devices and planning (NITI-40 jointly with factory #74) by August 1st, 1950.
  4. Development of transport devices, planning of equipment, and composition of technical-economical metrics (GSPI-7 jointly with the factory).
  5. Production of harnesses, experimental trials and implementation of labour intensive processes (see topic 104-102 for equipment) in 1950.
  6. Development of a project to organize and launch production of a new product (AK-47) and partial execution in 1950 (NITI-40).
  7. Production and implementation of the remaining harnesses and equipment, as well as introduction by NITI-40 of new processes for the production of the AK-47 system, development of guiding materials for the organization of assembly line production.
  8. Composition of a joint technical report."
4 pages later, we see:

"4. Execution of trials of an optical calibration system for the AK, correction of working blueprints, correction of the prototype in metal, correction of the optics, introduction of the device into production, composition of a technical report with trials and acceptance documents."